55+ projects across the Kingdom
Earthworks, infrastructure, buildings and rail for tier-one clients — from NEOM, AlUla and Qiddiya to Aramco and the Royal Commissions.
132KV UGC Installation AlUla Power Supply
2025Electrical infrastructure: installation of 132 kV underground cable serving three new 132/33 kV substations, with civil works for the underground power cable trench, developing power supply for the Royal Commission for AlUla.
BQR Transmission Line
2025Water Infrastructure: Mass Excavation, Water Transmission Pipeline Installation, Underground Utility Networks, Pipe Installation, Dewatering, Water Supply Systems
King Fahad Specialist Hospital Boiler Replacement
2025MEP infrastructure: replacement of diesel boilers with electrical boilers, mechanical systems upgrade, electrical distribution, HVAC integration and commissioning.
Renewed Water Transmission System - Al-Khalil to Taibah 1 & 2 IWTP
2025Supply and execution of civil and electromechanical works for the pumping station, its associated buildings and the pipelines, on the renewed (treated) water transmission system running from the Al-Khalil station in Medina to the Taibah 1 and Taibah 2 independent production plants.
District 13 Equestrian Development
2024Site development and demolition for the District 13 equestrian venue at Qiddiya: structural demolition, material processing, heavy hauling, earthmoving and site drainage.
Hidden Marina Excavation
2024Bulk excavation and site development executed as a subcontract package at Hidden Marina, the first segment of THE LINE at NEOM's Red Sea end: structural demolition, material processing, heavy hauling, earthmoving, environmental remediation and water management systems.
Modular Factory Project
2024Modular factory site works: foundation preparation, platform construction, service connections and site drainage.
Spine Precast Concrete Facility
2024Site and road development for a precast concrete production facility serving THE SPINE: subgrade preparation, material transport, soil compaction, paving, drainage systems, road markings, stormwater management and site water supply.
Trojena Dam, Lakebed and Bow
2024Earthworks and lakebed preparation executed as a subcontract package at NEOM Trojena — a scheme comprising three dams (145 m, 38 m and 65 m) and a 2.8 km artificial lake, with some 3 million m3 excavated at placement rates reaching 90,000 m3 per week.
150M Utility Corridor Development
2023Utility corridor development: corridor excavation, material processing, heavy hauling, earthmoving, compaction testing and environmental remediation for underground service routes.
Airport Provision of Earthworks and Grading
2023Airside and landside earthworks: mass excavation, formation grading, compaction and drainage provision.
HIDC Industrial Support Facilities
2023Site development for industrial support facilities: mass excavation, platform grading, access routes, underground utility provision and drainage.
Highway 55 Upgrade Earthworks
2023Highway upgrade earthworks: subgrade preparation, cut and fill, material transport, compaction and roadside drainage.
Package 4 & 6 Road & Utility Works
2023Road and utility infrastructure executed as a subcontract package within the Royal Commission for AlUla's infrastructure programme: subgrade preparation, paving, underground utilities, drainage systems and traffic controls.
Spine Earthworks Lot 10.6
2023Bulk earthworks on Lot 10.6 of THE SPINE, NEOM's primary linear infrastructure corridor: mass excavation, grading, soil management, erosion control, dewatering, water-table management and drainage infrastructure.
Coastal Offices Phase 1
2022Coastal site development for permanent office facilities: excavation, dewatering, foundation preparation, backfilling and site drainage.
Coastal Temporary Offices
2022Temporary office facility site works: platform grading, access, service connections and drainage provision.
North Bay Access Road
2022Access road construction (phased package): subgrade preparation, material transport, compaction, surface course and roadside drainage.
Oxagon South Demolition
2022Structural demolition and site clearance at Oxagon South: demolition, material processing, segregation and heavy hauling.
The Connector Rail Corridor Earthworks
2022Corridor enabling earthworks executed ahead of the main civil award: excavation, material transport, backfilling, compaction, grading, water-supply logistics and temporary water distribution networks.
Maaden Waste Management
2021Environmental earthworks and water containment: retention pond construction, water management systems, geomembrane lining installation and erosion control.
North Bay Access Road
2021Access road construction (phased package): subgrade preparation, material transport, compaction, surface course and roadside drainage.
North Bay Access Road
2021Access road construction (phased package): subgrade preparation, material transport, compaction, surface course and roadside drainage.
North Bay Mass Grading
2021Mass grading of the North Bay development platform: excavation, cut and fill, compaction and surface-water control.
Oxagon Helios Earthworks Phase 1
2021Site earthworks (Phase 1) executed as a subcontract package in the Helios area of NEOM Oxagon — the location of the NEOM green hydrogen and ammonia production plant: excavation, grading, material processing and compaction.
Oxagon Helios Earthworks Phase 2
2021Site earthworks (Phase 2) executed as a subcontract package in the Helios area of NEOM Oxagon — the location of the NEOM green hydrogen and ammonia production plant: excavation, grading, material processing and compaction.
Oxagon Port Access Road
2021Port access road construction: subgrade preparation, material transport, compaction, paving and drainage.
Oxagon Southern Buffer Zone
2021Buffer-zone site preparation: mass grading, excavation, material processing and erosion control across the southern boundary.
Site Development Light Industries Area
2021Complete site infrastructure for the Light Industries Area of Jubail Industrial City: land development, utility networks, drainage systems, access roads and landscaping preparation.
Temporary Roads
2021Temporary construction road network: formation, material placement, compaction and maintenance for site haulage.
Master Gas System II
2020Heavy civil enabling works executed as a subcontract package on Saudi Aramco's Master Gas System Expansion Phase 2 — the programme that raised MGS capacity to 12.5 billion scfd: mass excavation, infrastructure installation, utility corridors and drainage systems.
Ajyal Access Bridge Works
2019Bridge and approach-road construction executed as a subcontract package within Saudi Aramco's Ajyal community development at South Dhahran, including roads and interchange works.
Jubail Military Airport Development
2019Airport development works: earthworks, pavement construction, drainage and associated site infrastructure.
Jizan Commercial Port
2018Container-yard pavement construction at the Jazan port facility: cement-bound granular material and concrete paving, pavement layers, material testing and surface finishing, with associated earthworks, drainage and site infrastructure across the yard areas.
Jizan Industrial Area Development
2018Industrial area site development: land preparation, excavation and backfill, road networks, utility corridors and drainage.
Jizan Refinery
2018Heavy civil development involving mass excavation, infrastructure installation, utility corridors, and drainage systems, including 372,500 m² lining of concrete paving and trapezoidal storm water channels.
Railway Route Diversion
2018Railway route diversion works: formation earthworks, embankment construction, drainage and track-bed preparation.
Relocation of Railway Project
2018Railway relocation works: route earthworks, embankment and cutting construction, drainage systems and track-bed preparation.
Water Reservoir Works
2018Heavy Civil Development: Mass Excavation, Infrastructure Installation, Utility Corridors, Drainage Systems
Ajyal Housing Project
2017Residential construction and community infrastructure executed as a subcontract package on Saudi Aramco's Ajyal Community (South Dhahran Home Ownership Program) — an 8,500+ unit community over 10 km2 whose infrastructure includes a storm water system designed to recharge groundwater by infiltration and greywater reuse for irrigation.
Al-Matrafia Neighborhood Centers
2016Neighbourhood centre development at Al-Matrafia, Jubail: site development, utility networks, storm water drainage, main pipelines, pump stations, water distribution piping, roads and street lighting.
Jizan Refinery
2016Underground utility infrastructure and pumping station works executed as a subcontract package at Saudi Aramco's 400,000 bpd Jazan Refinery on the Red Sea.
Taif Housing Project
2016Residential construction: housing units with associated site works, utility connections and external areas.
Ministry of Housing Projects
2015Residential development programme: housing construction with site infrastructure, utility networks, internal roads and drainage.
Tasnee Housing Projects
2014Residential compound construction for the National Industrialization Company (Tasnee) in Jubail Industrial City: housing units with site infrastructure, utility networks and external works.
Osais Compound Rehabilitation
2013Residential compound rehabilitation: structural refurbishment, MEP renewal, external works and utility upgrades.
Al-Turki Compound Development
2012Residential compound development: construction of housing units with site infrastructure, utility networks, internal roads and landscaping.
Domus Housing Complex
2011Housing complex construction: residential buildings with associated site works, utility connections and external areas.
KFU Auditorium
2010Auditorium construction at King Fahd University: structural works, envelope, internal fit-out and associated site works.
Wasit Gas Plant Housing
2009Worker accommodation and support infrastructure executed as a subcontract package during construction of Saudi Aramco's Wasit Gas Plant near Jubail — a 2.5 billion scfd non-associated gas plant brought onstream in 2015.
Jubail University College
2008Educational campus construction: structures, internal roads, site utilities and landscaping for Jubail University College.
Royal Commission Camps
2007Labour accommodation camps: land grading, internal roads and parking, potable and fire water distribution, sanitary wastewater systems, electrical power and pre-engineered accommodation units.
Al-Rabih Hotel
2006Hotel construction: structural works, building envelope, internal fit-out and associated site works.
Recreational Center Development
2005Recreational centre development: building construction, external works, landscaping and site utilities.
Primary and Intermediate Schools
2004Construction of primary and intermediate school buildings with associated site works, utilities and external areas.
