End-to-end contracting, freight, and equipment — documented to the last page
Tondro runs construction, professional services, equipment rental, and overland freight across Saudi Arabia and the corridor to Jordan — quote to mobilize to execute to collect, with an audit-grade document trail on every job.
What We Run
General contracting with an audit-grade paper trail
Estimate, mobilize, execute, hand over — every stage documented. Construction, environmental and advisory capability across the Eastern Province and the Kingdom.
- Estimate-to-handover execution
- Audit-grade document control
- Environmental & advisory capability
Verified fleet, dry or operated
220 owned, maintained equipment units — excavators, dozers, graders, trucks and tankers — for dry or operated rental across Dammam, Al Khobar and the Eastern Province.
- Owned, maintained fleet
- Dry or operated rental
- Documented asset history
Named cargo, booked capacity, documented movement
We move cargo overland across Saudi Arabia and the corridor to Jordan — named bookings, dispatch tracking, and a documented proof-of-delivery chain on every load.
- KSA–Jordan corridor capacity
- Documented proof of delivery
- Dispatch tracking
Selected Projects
BQR Transmission Line
2025Water Infrastructure: Mass Excavation, Water Transmission Pipeline Installation, Underground Utility Networks, Pipe Installation, Dewatering, Water Supply Systems
Hidden Marina Excavation
2024Bulk excavation and site development executed as a subcontract package at Hidden Marina, the first segment of THE LINE at NEOM's Red Sea end: structural demolition, material processing, heavy hauling, earthmoving, environmental remediation and water management systems.
Spine Earthworks Lot 10.6
2023Bulk earthworks on Lot 10.6 of THE SPINE, NEOM's primary linear infrastructure corridor: mass excavation, grading, soil management, erosion control, dewatering, water-table management and drainage infrastructure.
The Connector Rail Corridor Earthworks
2022Corridor enabling earthworks executed ahead of the main civil award: excavation, material transport, backfilling, compaction, grading, water-supply logistics and temporary water distribution networks.
Master Gas System II
2020Heavy civil enabling works executed as a subcontract package on Saudi Aramco's Master Gas System Expansion Phase 2 — the programme that raised MGS capacity to 12.5 billion scfd: mass excavation, infrastructure installation, utility corridors and drainage systems.
Our Clients


















Quality, Health, Safety & Environment
QHSE management systems aligned to ISO 9001/14001/45001.
